Skip to main content Skip to complementary content
  • New archived content: Talend MDM, Talend Data Catalog 8.0, and Talend 7.3 products reached their end of life in 2024. Their documentation was moved to the Talend Archive page and will no longer receive content updates.
Close announcements banner

Linking the components

Procedure

  1. In the Integration perspective of Talend Studio, create an empty Job from the Job Designs node in the Repository tree view.
    For further information about how to create a Job, see Creating a Job.
  2. Drop tHiveConnection, tHiveCreateTable and tHiveLoad onto the workspace.
  3. Connect them using the Trigger > On Subjob OK link.

Did this page help you?

If you find any issues with this page or its content – a typo, a missing step, or a technical error – please let us know!